Waste Oil Management, South Sudan

Supply and installation of ten waste oil management facilities across South Sudan, reducing the environmental and health effects of uncontrolled oil spillages.

Project overview

Amanda Engineering, in partnership with Tong Group Africa, supplies machinery and equipment for an ongoing waste oil management project in South Sudan. The programme covers ten waste oil management facilities across the states of Unity, Upper Nile, Jonglei and other regions.

The project is aimed at reducing the adverse environmental and health effects of uncontrolled oil spillages from oil fields and related operations.

Client
Tong Group Africa
Location
South Sudan
Scope
10 waste oil management facilities
Amanda role
Supply, installation and project support, in partnership with Tong Group Africa
Status
Ongoing
Sector
Oil & Gas / Environment
Scope of services

What we delivered.

The assignment was delivered by Amanda Engineering and its associates, with the client and project partners.

  • Supply of machinery and equipment for ten waste oil management facilities.
  • Installation and commissioning support across project states.
  • Reduction of environmental and health effects from uncontrolled oil spillages.
  • Feasibility and land acquisition support for waste oil management.
  • Stakeholder and regulatory coordination.
  • Monitoring and evaluation of facility performance.
Project notes

Waste oil management across South Sudan

The engineering and delivery context behind the assignment.

The waste oil management programme in South Sudan is an environmental and public health intervention. It covers ten facilities across Unity, Upper Nile, Jonglei and other states.

Amanda Engineering, in partnership with Tong Group Africa, supplies machinery and equipment for the facilities, which are intended to reduce the adverse effects of uncontrolled oil spillages.

The project involves equipment supply, installation and commissioning support, with attention to site access, operator training, safe handling and maintenance.

The programme is ongoing and demonstrates how engineering procurement can support environmental protection in challenging operating environments.

Facility supplyMachinery and equipment are supplied for ten waste oil management facilities.
Installation supportInstallation and commissioning are planned around site access and operations.
Environmental outcomeControlled management reduces soil, water and health impacts.
Ongoing programmeThe project is being delivered in phases across the states.
Key challenges

What made the assignment demanding.

Ten facilities in different locations require consistent supply, installation and operating standards.

  • Delivering the same facility standard across multiple sites.
  • Coordinating supply, installation and commissioning with the local partner.
  • Maintaining consistent environmental and operating controls at every site.
Outcome

Project result.

The programme is designed to improve waste oil management across South Sudan and reduce the environmental and public health impact of oil field operations.

Translate page Kiswahili Français العربية 中文 English Powered by Google Translate