50 MW Solar Plant, Garissa

Civil works on Kenya's flagship 50 MW solar plant, including the 132kV transmission line, substation, staff housing and paved roads.

Project overview

Amanda Engineering supported civil works for the 50 MW Garissa solar plant, a flagship renewable energy project developed for the Rural Electrification Authority. The plant connects to the national grid through a 14 km 132kV transmission line and a 132/33kV substation.

Our scope covered the civil and structural works that support the solar array, the transmission connection and the permanent staff facilities. The project was delivered under the overall programme of the Government of Kenya.

Client
Rural Electrification Authority
Location
Garissa County, Kenya
Period
2017–2018
Contract value
KES 35.98M, Amanda civil works contract
Amanda role
Civil works for the 132kV transmission line, substation and staff facilities
Status
Completed
Sector
Solar / Transmission
Scope of services

What we delivered.

The assignment was delivered by Amanda Engineering and its associates, with the client and project partners.

  • Civil works on the 132kV transmission line and 132kV substation.
  • Construction of nine staff houses, a control centre and a 33kV switch room.
  • Paved and gravel access roads, perimeter wall, gates and watch towers.
  • Septic tanks, underground concrete tanks, storm drainage and a basketball pitch.
  • Construction supervision and quality control across the civil works packages.
Project notes

Civil works for a flagship solar plant

The engineering and delivery context behind the assignment.

The Garissa project is one of Kenya's flagship solar plants. Amanda Engineering supported the civil works that allow the solar array, the grid connection and the operating team to function as an integrated facility.

The civil scope included works on the 132kV transmission line and substation, nine staff houses, a control centre, a 33kV switch room, access roads, perimeter wall, gates, watch towers, septic tanks, underground concrete tanks, storm drainage and a basketball pitch.

In a hot, dry and remote location, concrete curing, dust control, water supply, material delivery and worker welfare require early planning. Access roads and drainage must perform during intense rainfall without compromising the array or the substation.

Quality control covered setting out, excavation, reinforcement, formwork, concrete placement, finishes and external works. The completed civil works support the plant's connection of 50 MW to the national grid.

Grid connection civil worksTransmission line and substation civil works were coordinated with the electrical package.
Operations facilitiesStaff housing, control centre and switch room support long-term plant operation.
Access and drainageRoads and storm drainage protect the array and keep the site operable.
Quality and completionInspection, testing and records supported handover.
Key challenges

What made the assignment demanding.

The civil works had to fit around an electrical installation programme on a remote site.

  • Coordinating civil works with the transmission line, substation and electrical installation programme.
  • Maintaining quality control across foundations, structures and staff facilities.
  • Managing site access, interfaces and handover documentation with the client and contractor.
Outcome

Project result.

The civil works provided the foundations, access and staff facilities needed to operate the plant and connect 50 MW of solar generation to the national grid at Garissa.